Most truss is bought on tube size and price. Most truss problems happen because nobody read the load table.
A load table is the only document that tells you what a section can carry at the span you actually plan to use. It is also the document most often skipped, because the numbers look abstract until something sags — or worse.
This guide explains how to read one: what the columns mean, why the same truss carries so much less over a longer span, and which loads people forget to count.
A proper table is not one number. It is a grid: span across the top, permissible load down the side, usually with a deflection figure attached.
Read it in this order:
A supplier who gives you "up to 500 kg" with no span attached has given you nothing usable.
Uniformly distributed load spreads across the span — a lighting bar with fixtures along its length, an LED wall hanging from multiple points, a line of par cans.
Point load sits in one place — a single heavy mover, a speaker cabinet on one hook, a chain hoist picking up at centre.
The same truss handles these very differently. A centre point load produces the highest bending moment for the same total weight, so the permissible total load in a CL column is usually much lower than in the UDL column at the same span. If your rig is four fixtures spread evenly, reading the UDL column is right. If it is one heavy item in the middle, you must read the CL column — or add a second pick-up point.
Capacity does not fall in a straight line as span increases. It falls much faster, because bending moment grows with span while the section's resistance stays fixed.
Practically: a section that carries a comfortable load at 6 m may carry a small fraction of it at 12 m. This is why "what can this truss hold" is not a question with an answer — only "what can it hold at this span, with this load pattern" is.
The same logic applies to towers and ground support: height is span turned vertical. A leg at 2 m and the same leg at 5 m are different structures.
A truss can be within its load rating and still be wrong for the job, because it sags.
Deflection limits are usually expressed as a fraction of span — L/100 or L/200 are common reference points, with the stricter figure used where sightlines, camera framing or moving scenery matter.
Why it matters on site:
If the table gives load but no deflection, ask for the deflection at your span and load. It is the difference between "it held" and "it worked".
Real rigs are heavier than the gear list suggests. Count these before you compare against the table:
Then apply a margin. Load tables describe limits, not comfortable working conditions.
Can I hang more if I add a pick-up point?
Usually yes, and it is the cheapest fix. Reducing span raises capacity far more than upsizing the section at the same span.
Is a bigger tube always stronger?
Not by itself. Chord size, wall thickness, bracing pattern and span all contribute. Compare sections using their own tables at your span, not by eye.
What does L/200 mean?
The maximum permitted sag is span divided by 200. At 10 m, that is 50 mm. A stricter limit (L/300 or tighter) is sometimes required for camera work or precision scenery.
Can I use one table for a different brand's truss?
No. Tolerances, materials and bracing differ. Use the manufacturer's table for that specific section.