Before any metal touches the ground, verify your floor plan. Ensure the ground is level and can support the point loads of the towers. Clear the area of unauthorized personnel and conduct a full safety briefing.
Lay out heavy-duty steel base plates. For outdoor setups, always use outriggers (stabilizers) to increase the tower footprint. Level the base plates using adjustable screw jacks for a perfectly vertical lift.
Connect the hinge section to the base plate — this allows you to assemble the truss tower horizontally on the ground and tip it up safely. Attach the sleeve block to the hinge.
Attach chain hoists to the top section and connect chains to the sleeve blocks. Perform a cross-check before lifting — all connections tight, all pins clipped, no tools left on the truss.
Lift slowly and evenly. If using multiple motors, ensure synchronization to avoid uneven torque. Once at height, dead-hang the truss or use safety cables as required by local regulations.